All categories
Number of views:
1000
Standard Auger
Retail price
0.0
元
Market price
0.0
元
Number of views:
1000
Product serial number
Category
CFA Tool
Quantity
-
+
Stock:
0
Product description
Parameters
CFA pile is drilled to the predetermined design depth in one continuous process using a continuous flight auger.
Concrete is then pumped under pressure down hollow stem of the auger to the bottom of borehole. Once pumping starts, the auger is progressively withdrawn, bringing soils with it to the surface.
When the auger and its load of soil are finally removed, reinforcement elements to meet the design requirements are placed in the concrete pile.
Continuous Flight Auger (CFA) piles are installed without significant vibration or excessive noise produced.
Standard auger is provided with bottom concrete exit with steel plug & recovery chain.
Scan the QR code to read on your phone
Previous
Auger with Side Exit
Copyright © Apile Foundation Equipment Co., Ltd. 京ICP备12036865号 Powered by www.300.cn Beijing